Jump to content

Jikovron

Full Members
  • Posts

    687
  • Joined

  • Last visited

Reputation Activity

  1. Like
    Jikovron got a reaction from Burnside in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  2. Like
    Jikovron got a reaction from ProgRocker in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  3. Like
    Jikovron got a reaction from Datsuncog in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  4. Like
    Jikovron got a reaction from 500tops in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  5. Like
    Jikovron got a reaction from Joey spud in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  6. Like
    Jikovron got a reaction from Soundwave in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  7. Like
    Jikovron got a reaction from High Jetter in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  8. Like
    Jikovron got a reaction from PicantoJon in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  9. Like
    Jikovron got a reaction from Dyslexic Viking in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  10. Like
    Jikovron got a reaction from LightBulbFun in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  11. Like
    Jikovron got a reaction from andyberg in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  12. Like
    Jikovron got a reaction from FakeConcern in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  13. Like
    Jikovron got a reaction from Erebus in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  14. Like
    Jikovron got a reaction from MiniMinorMk3 in Show us your estates   
    The only estate I've ever had so far, hoping to get it sorted for the road and tidy up old welding work, its my favourite spec for one of these : blue, late and 1700 flavour 
  15. Like
    Jikovron got a reaction from Steviemillar in Tales of eccentrism motoring 2012 onwards ,rag tag engineering   
    LOADS of time later 
    The skoda has been worked on at the new unit 

    This shell was a floppy mess, it sagged on the trailer bringing it down , so had to manipulate it back into shape 

    ive always wanted to stiffen up the sill and A pillar to do away with the weak horrible standard solution where the front doors are endlessly sagging
    the B pillar got its own pedestal to tie onto and its still got enough flex to work perfectly fine 


    and then spend hours tieing abit of B pillar to the A pillar as its the same hinge pattern but thicker metal

    rotten tunnel was next up, a local place folded up this for £35 which was an epic bargain, saved loads of time messing about but still had to cut out and weld in all the threaded plates for various things on the tunnel 

    Hours later its all welded in, mega strong now as I specified 1.5mm steel 
  16. Like
    Jikovron got a reaction from Erebus in Tales of eccentrism motoring 2012 onwards ,rag tag engineering   
    LOADS of time later 
    The skoda has been worked on at the new unit 

    This shell was a floppy mess, it sagged on the trailer bringing it down , so had to manipulate it back into shape 

    ive always wanted to stiffen up the sill and A pillar to do away with the weak horrible standard solution where the front doors are endlessly sagging
    the B pillar got its own pedestal to tie onto and its still got enough flex to work perfectly fine 


    and then spend hours tieing abit of B pillar to the A pillar as its the same hinge pattern but thicker metal

    rotten tunnel was next up, a local place folded up this for £35 which was an epic bargain, saved loads of time messing about but still had to cut out and weld in all the threaded plates for various things on the tunnel 

    Hours later its all welded in, mega strong now as I specified 1.5mm steel 
  17. Like
    Jikovron got a reaction from captain_70s in Tales of eccentrism motoring 2012 onwards ,rag tag engineering   
    LOADS of time later 
    The skoda has been worked on at the new unit 

    This shell was a floppy mess, it sagged on the trailer bringing it down , so had to manipulate it back into shape 

    ive always wanted to stiffen up the sill and A pillar to do away with the weak horrible standard solution where the front doors are endlessly sagging
    the B pillar got its own pedestal to tie onto and its still got enough flex to work perfectly fine 


    and then spend hours tieing abit of B pillar to the A pillar as its the same hinge pattern but thicker metal

    rotten tunnel was next up, a local place folded up this for £35 which was an epic bargain, saved loads of time messing about but still had to cut out and weld in all the threaded plates for various things on the tunnel 

    Hours later its all welded in, mega strong now as I specified 1.5mm steel 
  18. Like
    Jikovron got a reaction from Dave_Q in Tales of eccentrism motoring 2012 onwards ,rag tag engineering   
    LOADS of time later 
    The skoda has been worked on at the new unit 

    This shell was a floppy mess, it sagged on the trailer bringing it down , so had to manipulate it back into shape 

    ive always wanted to stiffen up the sill and A pillar to do away with the weak horrible standard solution where the front doors are endlessly sagging
    the B pillar got its own pedestal to tie onto and its still got enough flex to work perfectly fine 


    and then spend hours tieing abit of B pillar to the A pillar as its the same hinge pattern but thicker metal

    rotten tunnel was next up, a local place folded up this for £35 which was an epic bargain, saved loads of time messing about but still had to cut out and weld in all the threaded plates for various things on the tunnel 

    Hours later its all welded in, mega strong now as I specified 1.5mm steel 
  19. Like
    Jikovron got a reaction from mk2_craig in Tales of eccentrism motoring 2012 onwards ,rag tag engineering   
    LOADS of time later 
    The skoda has been worked on at the new unit 

    This shell was a floppy mess, it sagged on the trailer bringing it down , so had to manipulate it back into shape 

    ive always wanted to stiffen up the sill and A pillar to do away with the weak horrible standard solution where the front doors are endlessly sagging
    the B pillar got its own pedestal to tie onto and its still got enough flex to work perfectly fine 


    and then spend hours tieing abit of B pillar to the A pillar as its the same hinge pattern but thicker metal

    rotten tunnel was next up, a local place folded up this for £35 which was an epic bargain, saved loads of time messing about but still had to cut out and weld in all the threaded plates for various things on the tunnel 

    Hours later its all welded in, mega strong now as I specified 1.5mm steel 
  20. Like
    Jikovron got a reaction from Tickman in Tales of eccentrism motoring 2012 onwards ,rag tag engineering   
    LOADS of time later 
    The skoda has been worked on at the new unit 

    This shell was a floppy mess, it sagged on the trailer bringing it down , so had to manipulate it back into shape 

    ive always wanted to stiffen up the sill and A pillar to do away with the weak horrible standard solution where the front doors are endlessly sagging
    the B pillar got its own pedestal to tie onto and its still got enough flex to work perfectly fine 


    and then spend hours tieing abit of B pillar to the A pillar as its the same hinge pattern but thicker metal

    rotten tunnel was next up, a local place folded up this for £35 which was an epic bargain, saved loads of time messing about but still had to cut out and weld in all the threaded plates for various things on the tunnel 

    Hours later its all welded in, mega strong now as I specified 1.5mm steel 
  21. Like
    Jikovron got a reaction from Sigmund Fraud in Tales of eccentrism motoring 2012 onwards ,rag tag engineering   
    LOADS of time later 
    The skoda has been worked on at the new unit 

    This shell was a floppy mess, it sagged on the trailer bringing it down , so had to manipulate it back into shape 

    ive always wanted to stiffen up the sill and A pillar to do away with the weak horrible standard solution where the front doors are endlessly sagging
    the B pillar got its own pedestal to tie onto and its still got enough flex to work perfectly fine 


    and then spend hours tieing abit of B pillar to the A pillar as its the same hinge pattern but thicker metal

    rotten tunnel was next up, a local place folded up this for £35 which was an epic bargain, saved loads of time messing about but still had to cut out and weld in all the threaded plates for various things on the tunnel 

    Hours later its all welded in, mega strong now as I specified 1.5mm steel 
  22. Like
    Jikovron got a reaction from worldofceri in Tales of eccentrism motoring 2012 onwards ,rag tag engineering   
    LOADS of time later 
    The skoda has been worked on at the new unit 

    This shell was a floppy mess, it sagged on the trailer bringing it down , so had to manipulate it back into shape 

    ive always wanted to stiffen up the sill and A pillar to do away with the weak horrible standard solution where the front doors are endlessly sagging
    the B pillar got its own pedestal to tie onto and its still got enough flex to work perfectly fine 


    and then spend hours tieing abit of B pillar to the A pillar as its the same hinge pattern but thicker metal

    rotten tunnel was next up, a local place folded up this for £35 which was an epic bargain, saved loads of time messing about but still had to cut out and weld in all the threaded plates for various things on the tunnel 

    Hours later its all welded in, mega strong now as I specified 1.5mm steel 
  23. Like
    Jikovron got a reaction from Isopon in Tales of eccentrism motoring 2012 onwards ,rag tag engineering   
    LOADS of time later 
    The skoda has been worked on at the new unit 

    This shell was a floppy mess, it sagged on the trailer bringing it down , so had to manipulate it back into shape 

    ive always wanted to stiffen up the sill and A pillar to do away with the weak horrible standard solution where the front doors are endlessly sagging
    the B pillar got its own pedestal to tie onto and its still got enough flex to work perfectly fine 


    and then spend hours tieing abit of B pillar to the A pillar as its the same hinge pattern but thicker metal

    rotten tunnel was next up, a local place folded up this for £35 which was an epic bargain, saved loads of time messing about but still had to cut out and weld in all the threaded plates for various things on the tunnel 

    Hours later its all welded in, mega strong now as I specified 1.5mm steel 
  24. Haha
    Jikovron got a reaction from Matty in Swift... eh? Nah!   
    Farkin ell all I have to do is blink and the content sweeps into the thread, that padsaw is absolutely at home in Wallsend 
  25. Haha
    Jikovron got a reaction from Jim Bell in Swift... eh? Nah!   
    Farkin ell all I have to do is blink and the content sweeps into the thread, that padsaw is absolutely at home in Wallsend 
×
×
  • Create New...